  North China electric power design institute engineering co., LTD.

  The expensive unit appointed project manager li hui, zhang hao, GuanMing in my company in ningxia hui three comrades masters energy co., LTD., wind power pile foundation project and ningxia hanard energy co., LTD. Wind power construction of infrastructure projects, the others to stay away from home, in the work bears hardships and stands hard work, overcome the poor construction conditions, weather, time and heavy task of construction, such as difficulty, enthusiastic service construction unit always want to think, urgent construction units in need, excellent professional quality and high technical level of my unit, durability, ensuring duly completed construction gave great support and help. In early march, ephedra mountain first wind field, masters a period to start up, li hui, GuanMing fai, such as a person not afraid of cold, many times to the scene reconnaissance road, especially in front of the dynamic compaction in the transformer substation, in order to ensure that our dynamic compaction equipment into the construction site smoothly, li line in check road conditions on the construction site, the hard-working and supervise the construction of the road to speed up the construction of roads, many times after the dynamic compaction equipment for us to approach provides guarantee on schedule. In the process of dynamic compaction construction, as a result of ephedra mountains of bad weather, wind, dust, geological condition is relatively complex, lee a line into the scene, often know the situation, for our construction provides some good advice. The geological conditions are complex, causing the construction difficulty of pile foundation to increase, the speed is slow, and the construction progress of the whole project has also had a great impact. Li in this case, a line in a timely manner to find all relevant units, actively cooperate with our improvements, especially in the lee led off at 9 o 'clock on the evening of May 19, zhang and others to my project department meeting to discuss the pile foundation slowly and cooperate with mixing station, concrete casting 22:30 EPCM and others to check the construction site conditions, put forward the proposal, 30 points once again return to my project department to discuss the solution, especially puts forward good suggestion on the construction technology, now in the morning was dragged tired body back to the management company.

  On August 2, casting has been carried out to the third level, in the process of the casting foundation ring deviation is serious, is li management company, a line of the mountain patrol, found the problem, management company technicians in the construction site with our technician immediately research countermeasure, guarantee the construction quality of the whole of the pile caps.

  The morning of September 16 ephedra mountain under the heavy rain, heavy rain lasted four hours and the floods washed away the only two road to the construction site, was the construction of the project department technical personnel also trapped in the mountain, on both sides of a county middle block cannot pass, the mountain of 19 # #, # 21, 23 foundation pit was soaked by the flood, the situation is very grim, project department of pump cannot be sent to the mountains. Under the heavy rain is still a lot, my company project department worker to see in the eye in the heart, all you have to roll up trouser legs stand a just a pass in the flood will pump to the construction site. At this time, the management company li general line is also anxious, personally to the on-site command, timely cooperate with us to solve some difficulties and problems in the construction process.

  During the construction of the project, the three members of EPCM li hui's team often took pains to visit the site and supervise the work. In this regard, ningxia islamic geological engineering group expressed its heartfelt thanks.

  Through the construction of several wind power projects in ephedra, the islamic geological workers of ningxia are brought

  Cheng group and huabei electric design institute engineering co., LTD. Are closely linked together, and have a brotherly affection. In the future, we will continue to strengthen cooperation with your company to promote mutual development.